The installation of globe valves, throttle valves, check valves, valve bodies and filters of automatic control valves shall comply with the requirements of design documents and the relevant provisions of GB/T 24919 of the current national standard "General Requirements for Installation, Use and Maintenance of Industrial Valves", and shall comply with the following provisions:

1. For the valves with good packing, good sealing performance of import and export, no rust and obvious defects after inspection, they can be installed directly after being checked and qualified according to the relevant provisions of GB/T 208001.4, which is the current national standard "Pressure Pipeline Specification Industrial Pipeline Part IV: Manufacturing and Installation". Valves that do not meet the requirements shall be installed directly. Disassemble, clean, replace damaged and invalid components, and carry out pressure and sealing tests according to design documents and technical documents. Installation is prohibited if the test is not qualified.

2. Installation of check valve and automatic control valve spool and filter core should be carried out after sewage is discharged from the system. When the spool is not disassembled or is not suitable for disassembly according to the requirements of technical documents, measures should be taken to prevent spool damage during installation and sewage discharge.

3. When the valves are installed in rows, the center of the valve handwheel should be in the same straight line.

4. Valves and filters that need to be installed on site for cryogenic equipment should reserve the thickness of the cold insulation layer according to the design requirements, and should not be embedded in the cold insulation layer.

stainless steel Check valve

The spool may be damaged by factors such as temperature effect during welding and impurities in sewage discharge. Therefore, paragraph 2 requires corresponding protection measures. Valves and filters often need to be inspected and maintained in the use process. Embedding in the cold insulation layer of the equipment will affect the performance of this work. Therefore, paragraph 4 requires that the thickness of the cold insulation layer be reserved according to the design requirements.

Pressure, temperature, liquid level, flow rate and other automatic control components and instruments, the control and actuator installation of automatic control valves shall comply with the requirements of design documents and the relevant provisions of the current national standard GB 50093, the Code for Construction and Quality Acceptance of Automatic Instrument Engineering, and shall comply with the following provisions:

For the well-packed, well-sealed import and export, no rust, no obvious defects after inspection, and the automatic control components and instruments during their warranty period, the control and actuator of the automatic control valve can be installed directly; for the automatic control components and instruments that do not meet the requirements, the control and actuator of the automatic control valve shall be in accordance with the current national standards. Quasi-automatic instrumentation engineering construction and quality acceptance code GB 50093 related provisions of the test, test unqualified prohibited installation. 2. The alarm devices that need to be installed on site should be tested for sensitivity before installation.

3. The cryogenic equipments need to install on-site automatic control components and instruments. The thickness of the cryogenic layer should be reserved according to the design requirements, and should not be embedded in the cryogenic layer.

4. When the equipment needs to be installed on site, the level gauge or the level sensor should be located strictly according to the requirements of the design and technical documents.

5. The liquid level gauge or liquid level sensor which needs to be installed on site for cryogenic equipment should be calibrated and recorded before the cold-keeping construction.

When the design is not required, the installation position of the thermometer or temperature sensor in the cold room should be unshielded and not affected by local heat and cold sources.

The alarm device refers to the super-low (super-low) alarm device of refrigeration system parameters such as liquid level, temperature and pressure. For example, the float level controller for super-high level alarm is used. The sensitivity test means that the alarm device can work normally by simulating the alarm conditions. Local heat and cold sources include but are not limited to cold bridges, refrigeration doors, refrigeration and hot gas pipelines, air cooler outlets, cold exhaust pipe surfaces, lighting fixtures, etc.

Safety valve installation shall comply with the relevant provisions and design and technical documentation requirements of GB/T 208001.4 of Pressure Pipeline Code Industrial Pipeline Part 4: Manufacturing and Installation. The setting pressure of the safety valve meets the requirements of the design documents, and the check and lead seal meets the relevant regulations of the safety production supervision department. The packing is intact, no rust and no obvious defects. It can be installed directly during the warranty period. Otherwise, it should be checked according to the relevant provisions of TSG ZF001, the current industry standard.

Butterfly valve

The installation of pressure gauges shall comply with the requirements of design and technical documents and the following provisions:

1. The calibration of pressure gauges and lead seals conform to the relevant regulations of the safety production supervision department. They are well packed, rustless and without obvious defects. They can be installed directly during the warranty period. Otherwise, they should be calibrated according to the relevant regulations of the safety production supervision department.

2. Ammonia special pressure gauge must be used in ammonia refrigeration system.

3. Protection level should not be lower than IP54.